Sheet Metal Fabrication Metal Box for Industrial Machine Housing and Assembly

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.:JV472
Condition:New
Certification:CE, GS, ISO9001
Material:Aluminum
Accuracy:+/-0.1mm
Process:Compound Die / Machining
Application:Metal Processing Machinery Parts
Runner:Hot Runner
Product Overview
Product Parameters
Our ServiceCNC Turning, CNC Milling, Laser Cutting, Bending, Wire Cutting, Stamping, EDM
Available MaterialAluminum, Stainless Steel, Brass, Copper, Titanium, Plastic, Alloy Steel
Surface TreatmentPlating, Brushing, Polishing, Anodizing, Sandblasting, Knurling
ApplicationAutomotive, Electronic device, Aerospace, Automatic Equipment
Tolerance±0.01mm ~ ±0.05mm
Lead Time5-25 Days (Based on quantity)
Products Show
Product Show 1
Industry Application
Application Scenario
Quality Control Standards
  • Comprehensive written procedures and policies
  • Fully equipped inspection department
  • Detailed records of incoming raw material
  • Consistent calibration and labeling of inspection tools
  • Analysis of root cause of non-conformances
  • Continuous staff suggestions for method and material improvement
QC Process
Frequently Asked Questions
Q: How can I get a quotation?
A: Please provide detailed drawings (CAD, PDF, STEP, etc.), material type, quantity, and surface treatment requirements for an accurate quote.
Q: What is your Minimum Order Quantity (MOQ)?
A: Our MOQ starts from 1 piece, allowing for prototyping and small-batch production.
Q: Do you offer free samples?
A: Yes, we can provide samples for quality inspection free of charge in many cases.
Q: Can you help with design if I don't have a drawing?
A: Yes, we offer design services based on your specific requirements and functional needs.
Q: How do you handle intellectual property and confidentiality?
A: We are happy to sign an NDA (Non-Disclosure Agreement) before receiving any drawings to ensure your design stays secret.
Q: What is the typical lead time for production?
A: Production usually takes 5-20 days, depending on the complexity and quantity of the order.

Related Products