Customized Precision Investment Sand CNC Metal Ductile Grey Iron Carbon Stainless Steel Aluminum Al Zamak Zinc Alloy Pressure Die Casting with Heat Treatment

Still deciding? Get samples of $ !
Request Sample

Product Description

Overview & Basic Info
Model NO.
customized
Application
Auto Parts
Machining
CNC Machining
Material
Aluminum Alloy
Surface Preparation
Polishing
Tolerance Grade
4
Certification
RoHS, ISO 9001:2008
Process
High Pressure Die Casting
Alloy
ADC12/A356/A380/A319/Zamak #3
Equipment
180 Ton-1200 Ton Die Casting Machine
Roughness
Ra3.2-Ra0.8
Tolerance
+/-0.5mm
Weight Range
0.01-20 Kg
Production Capacity
200 Tons Per Month
Certification: TS 16949 / ISO 9001: 2008

Our company specializes in the joint manufacturing and export of a diverse range of casting products for architectural, automotive, and mechanical applications. We boast a strong and highly efficient R&D team that is capable of designing and producing OEM and ODM products based on your ideas and samples.

Die Casting Capabilities
Casting tolerance: CT4-CT6
Piece weight: 10 g - 20 kg
Capacity: 200 tons per month
Die Casting Process Die Casting Products
Customized Products & Advantages
  • High dimensional precision
  • Casting surface smooth, roughness between Ra3.2-Ra0.4
  • Internal structure from casting, reduce machining work
  • High-quantity rapid production
Customized Aluminum Parts
Production Processhigh pressure die casting, injection molding, machining and surface finish
Surface Treatmentsand blasting, grinding, powder coating, e-coating, zinc plating, electroplating
Aluminium AlloyA360, A380, A383, AlSi10Mg, AlSi9Cu3, ADC3, ADC6, ADC12, ZL104 and ZL107
Zinc AlloyZamak #2, #3, #5
Production ChartDrawing or Sample → Making Mold/Tooling → Making Samples → Casting → Deburring → Secondary Machining (Drilling, Threading, Milling, Turning, CNC Machining) → Surface Treatment → Assembly → Quality Inspection → Packing → Delivered
Investment Casting

Founded in 2010 on the simple premise that quality, service, and on-time deliveries were crucial to developing lasting customer relationships. We know how important it is for manufacturers to produce their products consistently without delays or quality issues. Parts that cost pennies should never cause problems that cost dollars. We remain hyper-focused on long term value over short term gains.

Investment Casting Details
Processinvestment casting, CNC machining
Designs1. As customers' drawings | 2. As customers' samples
Testing FacilitySpectrometer, tensile test machine, hardness test machine, CMM dimension report
Precision MachiningCNC turning, milling, drilling, grinding, cutting, reaming and threading
FinishedPolishing, sand blasting, heat treatment, painting, powder coating, anodizing, electroplating, chrome plating, mirror polishing
ApplicationsAutomotive, railroad, medical, marine, pump body, valve parts, architectural and furniture parts
QC and Quality Control

Inspection equipment: In order to ensure the quality of the orders, our independent QC members carry out strict inspections at each stage:

1. Incoming material inspection
2. Inspection of work-in-progress
3. Finished product inspection
4. Random warehouse inspection
Inspection Equipment 1
Inspection Equipment 2
Surface Finish Options

Sandblasting / Bead blasting / Vibration grinding / Polishing / Brushed / Mirror polishing / Electropolishing / Electroplating / Painting / Anodizing / Powder coating

Surface Finish Samples
Packaging & Shipping
Global Shipping
Packaging Box
Loading Cargo
Frequently Asked Questions
How can I get a quotation?
Please send us the necessary information for the quote: technical drawings, material type, weight, quantity, and any special requests.
If we don't have a drawing, can you provide design support?
Yes, we can create professional drawings based on your physical samples and duplicate the product precisely.
What is the typical lead time for samples?
Sample production usually takes 25-30 days after the mold-making process begins, depending on the complexity of the product.
What is the turnaround time for main orders?
Main orders typically require 35-40 days after payment is confirmed. The exact timing depends on the specific product requirements.
What payment methods do you accept?
For tooling, we require 100% TT in advance. For the main production order, we require a 50% deposit, with the remaining 50% balance paid before shipment.
Which file formats can you process?
We can work with a variety of formats including PDF, ISGS, DWG, STEP, and MAX.

Related Products